Strict Standards: Non-static method Date_TimeZone::isValidID() should not be called statically in /usr/local/lib/php/Date/TimeZone.php on line 4715

Strict Standards: Non-static method Date_TimeZone::setDefault() should not be called statically in /usr/local/lib/php/Date/TimeZone.php on line 4716

Strict Standards: Non-static method Date_TimeZone::isValidID() should not be called statically in /usr/local/lib/php/Date/TimeZone.php on line 192

Strict Standards: Non-static method HTTP_Session::_init() should not be called statically in /usr/local/lib/php/HTTP/Session.php on line 803

Strict Standards: Non-static method HTTP_Session::localName() should not be called statically in /usr/local/lib/php/HTTP/Session.php on line 728

Strict Standards: Declaration of HTTP_Upload_Error::raiseError() should be compatible with & PEAR::raiseError($message = NULL, $code = NULL, $mode = NULL, $options = NULL, $userinfo = NULL, $error_class = NULL, $skipmsg = false) in /usr/local/lib/php/HTTP/Upload.php on line 261

Strict Standards: Declaration of HTTP_Upload_File::isError() should be compatible with PEAR::isError($data, $code = NULL) in /usr/local/lib/php/HTTP/Upload.php on line 855
Morrison Associates
 
Morrisons Associates
Projects
Conservation & Heritage   Manufacturing   Commercial & Refurbishment   Healthcare   Education   Retail & Leisure
Bison Concrete Products, Nationwide

Bison Concrete Products are leaders in the design and supply of precast and pre stressed concrete products, worldwide.            
Bison's commitment to investment in their industry has led to the development of a new state of the art production facility in Derbyshire, reinforcing their position as market leaders.

The facility commenced operation in April 2005 with projected increase in production of one third together with reduced lead times.

Bison's advances in technology enable not only faster production but improvements in installation time - assisted with such technologies as transducers.

www.bison.co.uk
www.gallifordtry.plc.uk

Bison Concrete Products Limited, Swadlincote, Derbyshire
Project cost : £30 million
Works commenced : June 2003
Works completed : due June 2005
Operational : April 2005

Project Manager : CDS
Structural Engineer's : Farebrothers & Partners
Architect : Pozzoni Design Group
Contractor : Galliford Try Construction




 
 
 
 
 © Morrison Associates . all rights reserved . site construct : clevercherry.com